Aurora Homepage
Forum Home Forum Home > Aurora Sequencer Software > Questions About Aurora
  Active Topics Active Topics
  FAQ FAQ  Forum Search   Calendar   Register Register  Login Login

does the scheduler send to lights

 Post Reply Post Reply Page  12>
Author
Message Reverse Sort Order
  Topic Search Topic Search  Topic Options Topic Options
christmas 01 View Drop Down
Groupie
Groupie
Avatar

Joined: 08 Feb 2009
Location: Male
Online Status: Offline
Posts: 49
  Quote christmas 01 Quote  Post ReplyReply Direct Link To This Post Topic: does the scheduler send to lights
    Posted: 21 Sep 2009 at 2:43am
thanks jonathon i have changed the pc to English USA and it works fine, so will just have to remember to change it on the nights that the show runs.
Many hands make christmas lights work
Back to Top
Bigindian View Drop Down
Beta Testers
Beta Testers
Avatar

Joined: 13 Oct 2007
Online Status: Offline
Posts: 373
  Quote Bigindian Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 6:15pm
I guess that hindsight is the best teacher.
 
 
The secret to creativity is knowing how to hide your sources.
Albert Einstein
Back to Top
Jonathan View Drop Down
Beta Testers
Beta Testers


Joined: 07 Sep 2008
Location: SoCal
Online Status: Offline
Posts: 1237
  Quote Jonathan Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 4:19pm
Well, let's first clear up how dates are read.  In the US, dates are read as MM/DD/YYYY, not DD/MM/YYYY as they are in Europe.  So, 01/12/2009 is January 12, 2009, not December 1, 2009.

This confusion has led to a few problems with other international users.  You'll want to set the date on your show computer to match the US format so the computer can properly communicate the correct date with Borealis. 

Next, ignore the calender itself.  Due to mouseover problems on Borealis last year for a certain user <ahem, me>, Michael (the programmer) disabled the calender.  Clicking on any date brings up the first available date for the month you happen to be on irregardless of what day you clicked on.  So for now, ignore the calender.

I want you to go to File, then select "New Schedule item".  Name your show.  Then manipulate the start date and end date boxes by hand using the US date format of MM/DD/YYYY.  So December 1, 2009 would be 12/01/2009, and January 10, 2009 would be 01/10/2009.  Then select the sequences you want to play in your loop, including a run once start sequence and a run once end sequence if you like.  The start and end sequences are optional, but you need at least one song in the main loop.  Once everything is the way you like it, hit Add.  If it added successfully, on the month your show is scheduled to run, you will see the show name and the time listed for it to run.  Once you hit the green Start button, it will wait for the next scheduled show. 

You do not need to have anything hooked up for this to work; the scheduler sends out the commands whether any network adapters (USB RS-485) or controllers (ACx16's) are listening to it or not. 
~Jonathan
Back to Top
christmas 01 View Drop Down
Groupie
Groupie
Avatar

Joined: 08 Feb 2009
Location: Male
Online Status: Offline
Posts: 49
  Quote christmas 01 Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 2:53pm
how come it only shows as january on my scheduler? does that mean i cant use it in may??
Many hands make christmas lights work
Back to Top
christmas 01 View Drop Down
Groupie
Groupie
Avatar

Joined: 08 Feb 2009
Location: Male
Online Status: Offline
Posts: 49
  Quote christmas 01 Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 2:40pm
that is what january 2010 shows all in white like you say december is suppose to


and here is the month of december, when i tell it to setup the days and right click on any day / date in december it always brings up 01/12/2009 and doesnt post the sequences ive uploaded? please help, have i not got the install correct, aurora works fine, but i dont have the pcd board or lights connected as yet does that make a difference?

Many hands make christmas lights work
Back to Top
Bigindian View Drop Down
Beta Testers
Beta Testers
Avatar

Joined: 13 Oct 2007
Online Status: Offline
Posts: 373
  Quote Bigindian Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 2:25pm
The scheduler shows the last two days of November which are dark grey.  The entire month of December is white.  The last two days on the calender are actually the month of January.  They are there as place holders more than anything else. 
If you right click on a day, it is the start date of your schedule.  You can select the days of the week, time to start and the time to finish. 
 
Once that is done, add your sequences and/or opening and closing and hit start.  Minimize Aurora and you are set.  It will run that schedule until the last date you set. 
 
If you start December 1 and end Jan 15, the calender will populate with the schedule.
 
Give it a try.  Let us know what happens
 
cheers
 
The secret to creativity is knowing how to hide your sources.
Albert Einstein
Back to Top
christmas 01 View Drop Down
Groupie
Groupie
Avatar

Joined: 08 Feb 2009
Location: Male
Online Status: Offline
Posts: 49
  Quote christmas 01 Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 1:56pm
on the tutorial the area where the dates for the month are ie 1st dec 2nd dec are coloured cream, but when i open up the scheduler on my pc here it shows dark grey, why??
Many hands make christmas lights work
Back to Top
Jonathan View Drop Down
Beta Testers
Beta Testers


Joined: 07 Sep 2008
Location: SoCal
Online Status: Offline
Posts: 1237
  Quote Jonathan Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 11:41am
Borealis is Aurora's scheduler, and it comes with the program.  You may find this Borealis tutorial handy.
~Jonathan
Back to Top
christmas 01 View Drop Down
Groupie
Groupie
Avatar

Joined: 08 Feb 2009
Location: Male
Online Status: Offline
Posts: 49
  Quote christmas 01 Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2009 at 10:56am
i have a question, now that all the sequences are finished, and that i have sourced all the music and checked and double checked and triple checked everything looks good, how do i make it all work on the days of the month if you know what i mean, ie in dlight i used the scedhuler to programme my dates last year, but now ive got aurora do i still use the orignal sceduler or download something related to aurora?
cheers thanks for your help.

Many hands make christmas lights work
Back to Top
breakbenj View Drop Down
Pre-Order User
Pre-Order User
Avatar

Joined: 21 Dec 2007
Location: Georgia
Online Status: Offline
Posts: 102
  Quote breakbenj Quote  Post ReplyReply Direct Link To This Post Posted: 21 Nov 2008 at 5:51pm
cool thanks
Jeff

Back to Top
 Post Reply Post Reply Page  12>

Forum Jump Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.06
Copyright ©2001-2007 Web Wiz

This page was generated in 0.594 seconds.